Bathroom Fitting, Brick Laying, Carpet Fitting, Coving, Decking, Electrics, Extensions & loft conversions, Flat Roofing, Full House Refurbishment, Full Kitchen Refurbishment, Groundwork, Kitchen Fitting, Laminate & Real Wood Flooring, Metal Stud Partition Walls, Painting & Decorating, Patch Work, Paving, Plastering & Rendering, Plumbing, Slab Laying, Staircases, Security System Installation, Suspended Ceilings, Tiling, UPVC Windows, Doors & Conservatories, Woodwork and Carpentry
love your home
  Case studies  
       
  Redd Chilli Case Study: Interior Floor Tiling  
       
  Project Brief

To install black slate tiles to a kitchen and dining room floor area within a second floor maisonette. The slate must have a deep black finish and be sealed to prevent any colour being transported from the tiles to the carpeted areas of the house.

 
 
 
  Date: July 2007  
  Location: Westcliff On Sea, Essex  
  Budget: Cost including all materials, labour and finishing £950  
  Time taken: 2 days from start to completion  
 
 
    Stage 1

The floors in this property were carpeted so all carpets and underlay had to be removed. Under the carpeting was an uneven floor covering of 5mm hardboard with parts missing so this also had to be removed.

The floorboards in this particular property were in poor condition and mostly loose. The next thing that had to be done was to make good the floorboards throughout the whole kitchen and dining room areas by taking out broken nails and re-securing the floorboards to the rafters taking care to avoid disturbing any underfloor pipework.
 
    Stage 2

Once the floorboards were secured, a thicker layer of plywood (10mm) was put down to absorb any slight movement from the aging floorboards.
 
 
  
  Stage 4

A plumb-line was stretched across the length of the two rooms to form a guide to tile to in order to create a centered line which would visually make the room appear longer. Flexible tile adhesive was applied onto the plywood layer to secure the floor tiles and the tiles were laid.
 
 
  
  Stage 5

Once the tile adhesive was dry the grouting could begin. Black grout was used to fill the gaps between the tiles and wall edges. Before the grout was dry the tiles were washed down thoroughly with clean sponges to remove any grout from the surface of the tiles and the skirting boards.
 
 
  
  Stage 6

The tiles were then sealed with a special slate formula, which also enhances the natural quality of a slate tile, and the project was complete.
 
  Client Comments

" It was the perfect installation, no mess, no fuss, how you managed to keep everything so clean around you i do not know". Mr Welch : Westcliff on sea, Essex.
       
       
 
click here for our FREE home improvements magazine!
 
© 2007 Redd Chilli Ltd | registered in England 06214049
Redd Chilli do not provide a sub-contracting service for third party companies and are not associated to any other building or design companies with exception to those within the Protege Group.
website by aubmedia
   
Servicing the UK including: London, Surrey, Essex, Berkshire, Hertfordshire, Buckinghamshire, Kent, Suffolk, Norfolk, Cambridgeshire and Bedfordshire.